Timeline
A French draft's revisions: correction before approval before final copy
Order French draft revisions, approval and a later substantive edit. Identify which version was approved from the supplied record rather than file date alone.
- B2
- 5 moments
- Put-in-order game
- Learn this in the B2 notebook →
In short
Approval attaches to the specified version and content, not automatically to the newest file. Track the correction, approval and later edit separately. A post-approval change to eligibility can require a new decision.
Yellow the idea to rememberBlue French to learn

A notice moves through three versions. The committee approves version B after a language correction. Version C then changes who may register. The record lets you identify the approved policy and the status of the later file without relying only on its modification date.
- 3 juin · version ALe texte réserve l’accueil aux personnes sans accès à Internet, mais contient un accord fautif.The text reserves reception for people without internet access but contains an agreement error.
- 4 juin · version BL’accord est corrigé ; le public et les horaires restent identiques.The agreement is corrected; the group and hours remain the same.
- 5 juin · décisionLe comité approuve explicitement la version B jointe au message.The committee explicitly approves version B attached to the message.
- 6 juin · version CUne modification remplace le public limité par « tous les habitants ».An edit replaces the limited group with “all residents”.
- 7 juin · note de suiviLe changement de public n’a pas encore été soumis au comité.The group change has not yet been submitted to the committee.
A later file can be less ready to send
Version C is newer but contains a substantive extension. The record says it has not been put to the committee. Version B is the one explicitly approved. This does not imply that every typo correction always needs fresh approval; the supplied later change concerns eligibility, which alters the decision.
La version B a été approuvée ; l’extension introduite dans C reste à examiner.
Version B was approved; the extension introduced in C remains to be examined.
When preparing a final copy, keep the version reference in the decision record. A useful handover names both current approved wording and pending change: B est validée ; C contient une proposition d’extension. This prevents an editorial workflow from silently becoming a policy change.